Industrial controls · 2025–present

Building and power controls

A building operator depends on readings from drives, meters, relays, and sensors. Harsh programs the controllers, configures the displays in Ignition, and checks the complete signal path during commissioning.

From the meter to the screen

A reading passes through a field device, a programmable logic controller (PLC), and a supervisory display. Harsh integrates these devices over Modbus TCP/IP, BACnet, and EtherNet/IP and configures the alarms operators use.

Finding a mismatch

Level 3 and Level 4 commissioning tests compare the physical reading with the value in the PLC and on the screen. When the values diverge, checking each handoff isolates the wiring, logic, or display issue.

All projects
Related case studyWhen one robot stops

Trace a local safety response across a fleet.